The second release of MUSE2. This milestone contains the remaining issues agreed with Adam for this engagement (though we will of course do other things not captured here).
I have set the due date to be one week before Mar 31st, which is Adam's reporting date.
List view
0 issues of 6 selected
- Status: Open.#1061 In EnergySystemsModellingLab/MUSE2;
- Status: Open.#1102 In EnergySystemsModellingLab/MUSE2;
- Status: Open.#360 In EnergySystemsModellingLab/MUSE2;
- Status: Open.#523 In EnergySystemsModellingLab/MUSE2;
- Status: Open.#143 In EnergySystemsModellingLab/MUSE2;
- Status: Open.#509 In EnergySystemsModellingLab/MUSE2;