Skip to content

It's 2025 now!

It's 2025 now! #199

Triggered via push March 21, 2025 16:06
Status Failure
Total duration 1m 6s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

12 errors
build (ubuntu-22.04, 3.11, 1.16)
Process completed with exit code 2.
build (ubuntu-22.04, 3.10, 1.16)
The operation was canceled.
build (ubuntu-22.04, 3.8, 1.19)
The strategy configuration was canceled because "build.ubuntu-22_04_3_11_1_16" failed
build (ubuntu-22.04, 3.10, 1.16)
The strategy configuration was canceled because "build.ubuntu-22_04_3_11_1_16" failed
build (ubuntu-22.04, 3.11, 1.19)
The operation was canceled.
build (ubuntu-22.04, 3.11, 1.19)
The strategy configuration was canceled because "build.ubuntu-22_04_3_11_1_16" failed
build (ubuntu-22.04, 3.10, 1.19)
The operation was canceled.
build (ubuntu-22.04, 3.10, 1.19)
The strategy configuration was canceled because "build.ubuntu-22_04_3_11_1_16" failed
build (ubuntu-22.04, 3.7, 1.16)
The operation was canceled.
build (ubuntu-22.04, 3.7, 1.16)
The strategy configuration was canceled because "build.ubuntu-22_04_3_11_1_16" failed
build (ubuntu-22.04, 3.7, 1.19)
The operation was canceled.
build (ubuntu-22.04, 3.7, 1.19)
The strategy configuration was canceled because "build.ubuntu-22_04_3_11_1_16" failed