Skip to content

Bump golang.org/x/crypto from 0.40.0 to 0.45.0 in /examples #748

Bump golang.org/x/crypto from 0.40.0 to 0.45.0 in /examples

Bump golang.org/x/crypto from 0.40.0 to 0.45.0 in /examples #748

Status Failure
Total duration 1m 27s
Artifacts

test.yml

on: push
Race Detection Tests
1m 23s
Race Detection Tests
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 1 warning
Go 1.24 Tests
Process completed with exit code 1.
Go 1.23 Tests
The strategy configuration was canceled because "test._1_24" failed
Go 1.23 Tests
The operation was canceled.
Go 1.23 Tests
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2