Problem
Nice-to-have features from the brief become phases with decimal numbers that look broken:
## Phase 14.5 (v2): Prometheus metrics
## Phase 15.5 (v2): Hybrid search
## Phase 16.5 (v2): Embedding caching
## Phase 17.5 (v2): Quantized INT8 model
Expected Behavior
Nice-to-have features should be grouped cleanly:
Option A - Single deferred section:
## Future Enhancements (v2)
These features are deferred until after MVP:
### Prometheus metrics
- Requirements TBD based on MVP learnings
### Hybrid search
- Requirements TBD based on MVP learnings
Option B - Numbered but separate:
## Phase 10: Future Enhancements
### 10.1: Prometheus metrics (v2 - Deferred)
### 10.2: Hybrid search (v2 - Deferred)
Impact
Moderate - The decimal phase numbers look like a bug to users. Creates confusion about plan structure.