-
Notifications
You must be signed in to change notification settings - Fork 2.1k
Pull requests: openshift/release
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
[WIP]test
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#76624
opened Mar 21, 2026 by
huangmingxia
Loading…
Model controller Kserve tests using in-repo Makefile target
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#76623
opened Mar 21, 2026 by
pierDipi
Loading…
Reduce WinC presubmit test count by excluding Disruptive and Serial tests
#76620
opened Mar 21, 2026 by
rrasouli
Loading…
OU-876: monitoring-plugin e2e tests
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#76618
opened Mar 20, 2026 by
etmurasaki
Loading…
WIP: feat: check rpm fixes
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#76615
opened Mar 20, 2026 by
eggfoobar
Loading…
Jf fvt prow
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#76614
opened Mar 20, 2026 by
jfrazierRedHat
Loading…
ARO HCP Use leasing of MSI mock SP in e2e-parallel job
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#76613
opened Mar 20, 2026 by
patriksuba
•
Draft
oc-mirror: cleanup linter test setup
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#76610
opened Mar 20, 2026 by
r4f4
Loading…
ci-staging: add NS to core-ci cluster
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#76609
opened Mar 20, 2026 by
Prucek
Loading…
OCPBUGS-78146: properly configure the periodics for KAS-O
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#76608
opened Mar 20, 2026 by
tjungblu
Loading…
Enable automatic payload reverts
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
Indicates that a PR is ready to be merged.
#76606
opened Mar 20, 2026 by
stbenjam
Loading…
WIP: Prepare downstream prow/ci jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#76605
opened Mar 20, 2026 by
matzew
Loading…
Add deploy-sno-reconfig-ipv6 test job for jetlag
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
openshift/frr: Correct misaligned ocp build images in 4.18 - 4.22
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#76603
opened Mar 20, 2026 by
sdodson
Loading…
[DEBUG] [DO NOT MERGE]
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#76600
opened Mar 20, 2026 by
tbuskey
Loading…
rhdh: add cluster health check and increase login timeout for hibernating clusters
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#76597
opened Mar 20, 2026 by
gustavolira
Loading…
2 tasks
debug
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#76596
opened Mar 20, 2026 by
jianlinliu
Loading…
Provision 4.22 cluster
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#76595
opened Mar 20, 2026 by
kabirbhartiRH
Loading…
Update the job name for report
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#76594
opened Mar 20, 2026 by
yingzhanredhat
Loading…
ci: onboard stolostron/capi-tests CAPZ e2e to OpenShift CI
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
Remove rhel-9-openstack-17-rpms from base rhel9 repo files
lgtm
Indicates that a PR is ready to be merged.
#76590
opened Mar 20, 2026 by
elfosardo
Loading…
Previous Next
ProTip!
What’s not been updated in a month: updated:<2026-02-21.